This dimension marks whether an energy project is planned, under construction, operating or retired. Wikipedia notes that "fossil-fuel subsidies are slowing the energy transition," a pace of change that affects whether individual projects actually reach completion or stall. Browsing by status separates projects that are operating from those still planned or already retired.
Facts
Comparison
Era of Emergence Browse By
Sources
1. Obninsk Nuclear Power Plant - Wikipedia
WikipediaHistory, Obninsk 1954 criticality and grid connectionQuote, History, Obninsk 1954 criticality and grid connection
First criticality was achieved on 2 May 1954, and the first grid connection was made on 27 June 1954.
View the Source Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.