This dimension marks whether an energy project is planned, under construction, operating or retired. Wikipedia notes that "fossil-fuel subsidies are slowing the energy transition," a pace of change that affects whether individual projects actually reach completion or stall. Browsing by status separates projects that are operating from those still planned or already retired.
Facts
Comparison
Era of Emergence Status
Sources
1. Solar Energy Generating Systems - Wikipedia
WikipediaIndividual locations, SEGS commissioning from December 1984Quote, Individual locations, SEGS commissioning from December 1984
The SEGS power plants were built by Luz Industries, and commissioned between December 20, 1984 and October 1, 1990.
View the Source Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.