The East African Crude Oil Pipeline Project, known as EACOP, is being developed by a consortium including France's TotalEnergies, the China National Offshore Oil Corporation and the Ugandan and Tanzanian national oil companies to carry crude oil from Uganda's Lake Albert oilfields to the Tanzanian port of Tanga for export. Construction formally began in 2023, and because the crude is unusually waxy, the pipeline must be heated along its full length to keep the oil flowing, a design requirement that adds significantly to its cost. The project has drawn sustained international opposition from environmental and human rights groups over its route through sensitive ecosystems and its associated land acquisition, with several international banks declining to finance it.
Facts
Project Type StatusUnder construction, with first oil originally targeted for the mid-2020s 2 ScalePlanned as a roughly 1,443-kilometer heated pipeline, intended to be the longest heated crude oil pipeline in the world 2 Connections
Uses Source
Pipeline construction project to carry crude oil from Uganda to the Tanzanian coast.
Sources
1. International Energy Agency Official Site
2. Encyclopedia Britannica
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.