Energy Atlas

How The World Is Powered
Sign In
Text size
100%
Theme
Energy Project

Boulder Canyon Project

Hydroelectric Dam Project

The Boulder Canyon Project was the federal undertaking authorized by the Boulder Canyon Project Act of 1928 to dam the Colorado River, control its flooding, store water for southwestern irrigation and municipal supply, and generate hydroelectric power. Construction of what became known as Hoover Dam ran from 1931 to 1936, employing thousands of workers during the Great Depression under a Bureau of Reclamation contract with the Six Companies consortium. The project's financing structure, in which power revenues repaid construction costs through long-term contracts with California and Nevada utilities, became a model for later federal hydropower projects across the American West.

Facts
Project Type
Hydroelectric Dam Project 1
Location
United States (Nevada-Arizona border, Colorado River) 1
Start Year
1931 1
Completion Year
1936 1
Status
Completed in 1936, ahead of schedule 2
Scale
Built Hoover Dam and a power station that reached about 2,080 MW; created Lake Mead, then the largest reservoir by volume in the United States 2
Connections

Uses Source

1928 US federal project that built Hoover Dam on the Colorado River.

In the Other Atlases
Sources
1. United States Bureau of Reclamation Site
United States Bureau of Reclamationhttps://www.usbr.gov/history/hoover.html
Quote, https://www.usbr.gov/history/hoover.html
The Boulder Canyon Project Act authorized construction of a dam in Boulder or Black Canyon, construction of the All-American Canal to connect the Imperial and Coachella Valleys with the Colorado River, and divided the lower basin waters among the lower basin states.
View the Source
2. Encyclopedia Britannica
Encyclopedia Britannica, Inc.View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.