The Olkiluoto 3 EPR Construction Project was undertaken by Finnish utility TVO with French-led contractor Areva-Siemens to build the first-of-a-kind European Pressurized Reactor design, under a fixed-price turnkey contract signed in 2003. Construction began in 2005 with an original completion target of 2009, but the project became notorious for repeated delays and cost overruns, ultimately taking more than seventeen years and roughly tripling its original budget amid extensive litigation between TVO and its contractors. The reactor finally reached regular commercial operation in 2023, becoming the first EPR unit completed anywhere and a much-studied cautionary case in nuclear construction management.
Facts
Project Type Completion Year StatusCompleted; entered regular commercial operation in 2023 after a thirteen-year delay 2 ScaleRoughly 1,600 MW, the first EPR reactor design to be completed anywhere in the world 2 Connections
Uses Source
EPR reactor construction project, Olkiluoto, Finland, connected to the grid in 2022 after prolonged delays.
In the Other Atlases
- Also in Geography Atlas: Finland, located there.
Sources
1. World Nuclear Association Information Library
World Nuclear Associationhttps://world-nuclear.org/information-library/country-profiles/countries-a-f/finlandQuote, https://world-nuclear.org/information-library/country-profiles/countries-a-f/finland
TVO completed final takeover of the Olkiluoto 3 EPR on 20 June 2025 following two years of commercial operation and a successful second annual outage.
View the Source 2. International Atomic Energy Agency Official Site
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.