Dogger Bank Wind Farm Project

Wind Farm Project

The Dogger Bank Wind Farm Project is a joint development by SSE Renewables, Equinor and Vargronn on the shallow North Sea sandbank of the same name, split into three consented phases, each with a capacity of around 1,200 MW. Construction of the first phase began in 2020, using very large turbines and, for the first time at this scale, high-voltage direct current transmission to bring power ashore in the north of England. On completion the project is intended to be the world's largest operating offshore wind farm, continuing a succession of UK North Sea projects that have repeatedly reset the scale of offshore wind development.

Facts
Project Type
Wind Farm Project 1
Location
United Kingdom (North Sea, Dogger Bank) 1
Start Year
2020 1
Status
Under construction in phases; Dogger Bank A began generating power in 2023 with later phases following 2
Scale
Planned combined capacity of roughly 3,600 MW across phases A, B and C, intended to be the world's largest offshore wind farm on completion 2
Connections

Uses Source

Offshore wind farm construction project, North Sea, United Kingdom, set to be the largest offshore wind farm in the world.

In the Other Atlases
Sources
1. Encyclopedia Britannica
Encyclopedia Britannica, Inc.View the Source
2. Power Technology
GlobalDatahttps://www.power-technology.com/projects/dogger-bank-c-offshore-wind-farm-north-sea-uk/
Quote, https://www.power-technology.com/projects/dogger-bank-c-offshore-wind-farm-north-sea-uk/
Dogger Bank C is the third and final phase of the 3.6GW, £9bn ($11.9bn) Dogger Bank wind project, which is expected to become the world’s biggest offshore wind farm upon completion.