MeyGen is a tidal stream energy project in the Inner Sound of the Pentland Firth, between the island of Stroma and the Scottish mainland. Its first phase began generating power in April 2018 using turbines with 18 meter rotors mounted on the seabed, and by 2025 the project had produced a cumulative 80 gigawatt hours of electricity from an installed capacity of 6 megawatts, with plans to expand toward a total of 400 megawatts. It has been described as the world's largest tidal stream power project.
Facts
Facility TypeTidal stream power station 1 LocationPentland Firth, Inner Sound, Scotland, United Kingdom 1 Capacity (MW)6 MW (4 x 1.5 MW) is the Phase 1 array only; further phases have been planned beyond this initial capacity. Commissioned YearThe infobox commissioning year is 2016, when the first turbine was connected to the grid; the four-turbine Phase 1 array reached full output in April 2018. Connections
Uses Source
Tidal stream energy project, Pentland Firth, Scotland, United Kingdom, one of the largest tidal stream arrays in the world.
In the Other Atlases
Sources
1. Wikipedia
Wikimedia FoundationWikipedia article, introduction paragraph
the Inner Sound between the Island of Stroma and the Scottish mainland
Wikipedia article infobox, ps_electrical_capacity field
6 MW (4 x 1.5 MW)
Wikipedia article infobox, commissioned field
2016
Operating status, entity description
by 2025 the project had produced a cumulative 80 gigawatt hours of electricity from an installed capacity of 6 megawatts, with plans to expand toward a total of 400 megawatts.