Taichung Power Plant

Thermal Generating Station

Taichung Power Plant is a coal and natural gas fired power station in Longjing District, Taichung, Taiwan, operated by the state owned Taiwan Power Company. Construction began in 1986, with the first of its ten 550 megawatt coal units entering service in 1991 and the last in 2006; the plant's overall nameplate capacity, including gas turbines and a small wind component, is about 5,780 megawatts. With roughly 5,500 megawatts of that capacity from coal alone, it ranks as the fourth largest coal fired power station in the world, and it has been counted among the ten most carbon polluting power plants worldwide.

Facts
Facility Type
Coal and gas-fired power plant 1
Location
Longjing District, Taichung City, Taiwan 1
Capacity (MW)
5780 1
Combined nameplate capacity across 10 coal units and 4 gas units per the infobox; an earlier automated summary of this same page mis-stated 5,500 MW, corrected here against the raw infobox field.
Commissioned Year
1990 1
Units 1-4 (gas) were commissioned in July 1990; coal-fired units were added in phases through June 2006.
Classification
Status
Operational 1
Connections

Uses Source

Coal, Energy Sources

Coal-fired power station, Taichung, Taiwan, one of the largest coal-fired power stations in the world by capacity.

In the Other Atlases

Located In

Also in Geography Atlas: where this subject is located.

Sources
1. Wikipedia
Wikimedia Foundation
  • Status: Operational
  • Facility Type: Coal and gas-fired power plant
  • Location: Longjing District, Taichung City, Taiwan
  • Capacity (MW): 5780
  • Commissioned Year: 1990
Taichung Power Plant (Wikipedia)
  • Wikipedia article, introduction paragraph
    a coal-fired power plant in Longjing, Taichung, Taiwan
  • Article text
    The Taichung Power Plant (Chinese: 台中發電廠; pinyin: Táizhōng Fādiànchǎng) is a coal-fired power plant in Longjing, Taichung, Taiwan (ROC).
  • Infobox: ps_electrical_capacity
    5,780 MW
  • Infobox: commissioned
    July 1990 (Unit 1-4 gas) March 1991 (Unit 1 coal) August 1991 (Unit 2 coal) June 1992 (Unit 3 coal) October 1992 (Unit 4 coal) March 1996 (Unit 5 coal) May 1996 (Unit 6 coal) October 1996 (Unit 7 coal) June 1997 (Unit 8 coal) August 2005 (Unit 9 coal) June 2006 (Unit 10 coal)
  • In Group: Coal, Gas and Biomass Power Stations, Lead
    The Taichung Power Plant (Chinese: 台中發電廠; pinyin: Táizhōng Fādiànchǎng) is a coal-fired power plant in Longjing, Taichung, Taiwan (ROC).
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.