The European Network of Transmission System Operators for Electricity, the Brussels association through which 40 transmission system operators from 36 countries run the secure and coordinated operation of the European electricity system. It was established on 19 December 2008 by 42 TSOs as the successor of six regional associations and became operational on 1 July 2009.
Facts
Organization TypeTransmission system operators association 1 Founded Year Headquarters Connections
Associated With
Source ENTSO-E Official Site
North Sea Link is catalogued in the ENTSO-E Ten-Year Network Development Plan as Project 110, the Norway-UK HVDC interconnector developed by National Grid and Statnett, in service since 2021.
Source ENTSO-E Official Site
Smart Grid, Technologies ENTSO-E coordinates European transmission system operators on grid modernization including smart grid integration in its Ten-Year Network Development Plan.
In the Other Atlases
Located In
Also in Geography Atlas: where this subject is located.
Source ENTSO-E Official Site
Sources
1. ENTSO-E Official Site
ENTSO-EAbout, Mission statement, Who we are
ENTSO-E, the European Network of Transmission System Operators for Electricity, brings together 40 member TSOs from 36 countries to ensure the secure and coordinated operation of Europe's electricity system
Contact page
Rue de Spa 8, 1000 Brussels, Belgium
- Associated With: North Sea Link Project
View the Source 2. Wikipedia
Wikimedia FoundationEuropean Network of Transmission System Operators for Electricity, HistoryQuote, European Network of Transmission System Operators for Electricity, History
ENTSO-E was established on 19 December 2008 in Brussels by 42 TSOs as a successor of six regional associations
View the Source Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.