Guri Dam, formally the Central Hidroeléctrica Simón Bolívar, is a hydroelectric dam on the Caroni River in Bolívar State, Venezuela. Its initial phase was completed in 1978 and the full plant was inaugurated in 1986, giving it an installed capacity of about 10,235 megawatts. It was for a time the largest hydroelectric power station in the world by installed capacity, a rank it took from the Grand Coulee Dam in the United States before Brazil and Paraguay's Itaipu Dam surpassed it. As of the mid 2000s Guri supplied more than a third of Venezuela's electricity in a country that draws roughly three quarters of its power from hydroelectric sources.
Facts
Facility TypeGravity and embankment dam 1 LocationNecuima Canyon, Bolívar State, Venezuela, on the Caroni River 1 Capacity (MW) Commissioned YearInitial phase entered service in 1978; the dam's final units were completed in 1986, reaching its present installed capacity. Connections
Uses Source
Hydroelectric dam on the Caroni River, Bolivar State, Venezuela, one of the largest hydroelectric facilities in the world.
In the Other Atlases
Located In
Also in Geography Atlas: where this subject is located.
Sources
1. Wikipedia
Wikimedia Foundation- Status: Operational
- Facility Type: Gravity and embankment dam
- Location: Necuima Canyon, Bolívar State, Venezuela, on the Caroni River
- Capacity (MW): 10,235
- Commissioned Year: 1978
Guri Dam (Wikipedia)
Lead section
The Simón Bolívar Hydroelectric Plant, also Guri Dam (Spanish: Central Hidroeléctrica Simón Bolívar or Represa de Guri), previously known as the Raúl Leoni Hydroelectric Plant, is a concrete gravity and embankment dam in Bolívar State, Venezuela, on the Caroni River, built from 1963 to 1969.
Article text
The Simón Bolívar Hydroelectric Plant, also Guri Dam (Spanish: Central Hidroeléctrica Simón Bolívar or Represa de Guri), previously known as the Raúl Leoni Hydroelectric Plant, is a concrete gravity and embankment dam in Bolívar State, Venezuela, on the Caroni River, built from 1963 to 1969.
Wikipedia article infobox, opening field
1978
Infobox: plant_capacity
10,235 MW
In Group: Hydroelectric Dams of South America, Lead
The Simón Bolívar Hydroelectric Plant, also Guri Dam (Spanish: Central Hidroeléctrica Simón Bolívar or Represa de Guri), previously known as the Raúl Leoni Hydroelectric Plant, is a concrete gravity and embankment dam in Bolívar State, Venezuela, on the Caroni River, built from 1963 to 1969.