Two Nuclei Merging

Energy released when light atomic nuclei fuse, the process that powers the Sun. Fusion promises abundant fuel and no long-lived high-level waste, and after seventy years of research no fusion device has yet delivered sustained net electricity to a grid. The international ITER project under construction in France is intended to demonstrate burning plasma at industrial scale, and a 2022 experiment at the National Ignition Facility achieved ignition with more fusion energy out of the target than the laser energy in.

Facts
Source Class
Prospective 1
Cross-Tradition Connections

Used By

Sources
1. International Atomic Energy Agency Official Site
International Atomic Energy AgencyView the Source
World Nuclear Association Information Library
World Nuclear AssociationUsed By: Tokamak, Information Library, Nuclear Fusion Power, Fusion technology
Quote, Used By: Tokamak, Information Library, Nuclear Fusion Power, Fusion technology
With current technology, the reaction most readily feasible is between the nuclei of the two heavy forms (isotopes) of hydrogen, deuterium (D) and tritium (T).
View the Source
Lawrence Livermore National Laboratory Site
Lawrence Livermore National LaboratoryUsed By: National Ignition Facility, News, LLNL achieves fusion ignition
Quote, Used By: National Ignition Facility, News, LLNL achieves fusion ignition
delivering 2.05 megajoules (MJ) of energy to the target, resulting in 3.15 MJ of fusion energy output
View the Source
Open Questions (2 open questions)
When, if ever, will the first fusion power plant begin generating electricity commercially?

As of 2025 the National Ignition Facility in the United States is the only laboratory to have demonstrated a fusion energy gain factor above one, but the efficiencies needed to reach engineering breakeven, a genuinely net electricity-producing plant, or economic breakeven, where the plant's output pays for its own whole-life cost, are still orders of magnitude away. Every operating fusion device today, including ITER once it reaches full operation, is an experimental or demonstration reactor, not a commercial power source, so no timeline for the first commercial plant is settled.

What would resolve this A published construction timeline from a national program or private fusion company (ITER, a national laboratory, or a company such as Commonwealth Fusion Systems) confirmed against an independent engineering assessment (IAEA or a national energy department) as targeting genuine grid-connected commercial generation, not a further experimental or demonstration milestone.
Plasma physics and fusion engineeringWikipedia
When, if ever, will nuclear fusion reach sustained, commercial electricity generation?

Fusion research has produced real breakthroughs, but every credible timeline for commercial deployment has slipped for decades; World Nuclear Association itself notes the field's own standing joke that commercial fusion has been "about 40 years away" since the 1970s. Current flagship projects target a demonstration of net electricity in the early 2030s to 2040, which is still a prototype, not proof that fusion can be operated economically and continuously at grid scale over decades the way a fission or gas plant is.

What would resolve this A named fusion plant delivering sustained electricity to a public grid on ordinary commercial terms (not a subsidized one-off demonstration), or an authoritative body such as the IAEA or a national fusion program concluding commercial fusion is or is not achievable within a stated decade.
Plasma physics and fusion engineeringWorld Nuclear Association Information Library

Take a Related Quiz

Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0 open reader challenges)
No disputes yet. Spotted an error or a better source? Open the first one.

View At A Past Year

The atlas records no dated fact of its own for this entry, so there is no other year to choose.